Typical Lead time is 1-2 weeks, but varies based on demand.
Unit of Measure
Specifications
Brands |
N/A GTek Automation |
Pressure Rating |
N/A 100 kPa1.0 kgf/cm²1.0 bar14.5 psig |
Rated Airflow |
N/A 0.8 L/min0.028 ft³/min |
Power Consumption |
N/A 12 W15 W |
Rated Frequency |
N/A 50 Hz |
Life Expectancy Mean Time to Failure (MTTF) |
N/A 4,000 h |
Hose Nipple Outlet Outside Diameter (OD) |
N/A 6 mm |
Duty Cycle |
N/A 30 min |
Coil Insulation Class |
N/A E or its equivalent (JETL) and B for UL |
Leadwire Length |
N/A 7-7/8 in200 mm |